10/14/2023

Putlog and independent scaffolding

By admin

The criteria are attached by a journal taken care of with best angle couplers and the putlogs are repaired to the ledgers using putlog couplers. The blade end of the putlog tube (or putlog adaptor) is normally put horizontally on the brickwork being built, making sure to use the optimum bearing area. All our scaffolders are highly trained and totally certified and comply with all Federal government standards. An independent scaffold consists of a double row of requirements, with each
row alongside the building. The inner row is established as near to the building as is achievable. A variant might be adopted in which the row of standards nearest to the building can be set back about 300 mm from the building face. Tower scaffold: A tower scaffold is an independent scaffold containing 4 upright members attached longitudinally and transversely. Mobile Scaffold: A mobile scaffold is an independent scaffold that is freestanding and placed on castors.